jesusjnr.blogg.se

Connect savannah dredge report
Connect savannah dredge report




connect savannah dredge report

Appendix L – 401 Water Quality Certification Appendix J-1 – CZMA Consistency Determination Response Appendix J – CZMA Consistency Determination Appendix I – NMFS ESA Biological Evaluation Appendix F1 – Comment Response Matrix July 2021 Comment Period Appendix B Attachment B4 – Subsurface Investigation Report

connect savannah dredge report

Appendix B Attachment B3 – Historical Borings Appendix B Attachment B2 – Modeling Report Appendix B Attachment B1 – Ship Simulation Report The IFR-EA presents the results of the study, an analysis of the impacts of the proposed measures on the environment, and an evaluation of the effects of continued operations and maintenance (O&M). Army Corps of Engineers, Savannah District, has prepared an Integrated Feasibility Report (IFR)/Environmental Assessment (EA) and a Finding of No Significant Impact (FONSI) under the authority of Section 1201 of the Water Resources Development Act (WRDA) of 2016 and in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended, for the Brunswick Harbor Navigation Project Modifications and Harbor Dredging Operations and Maintenance in Glynn County, Georgia.






Connect savannah dredge report